E-BOP works
Aster undertakes Design to Commissioning of Sub-Stations and Switch Yard works of Power Plants all over India. The scope includes HV Substation, Bus Ducts and/or Cable and Connections, Transformers, Generator Circuit-breakers, Excitation Equipment, Power Plant Main, LV/MV Switchgear, LV-MCC Distribution, Switchgear, UPS System, Batteries/Inverters, Diesel Sets, and DCS System/Main Control.
Plant Electrification
Aster is committed to provide Quality Product and Services to the Customers for Plant Electrification services. The Plant Electrification work covers Conceptual studies and detailed Engineering, Electrical Schemes and Single Line Diagrams, Sizing and Selection of Electrical Equipment, Metering and Protection Schemes, Indoor Switch gear distribution Boards and Cubicle, Control, Indication and Alarm Annunciation System, D.C. Control Power Supply Equipment, AC Auxiliary Power Supply Equipment, Optimized solutions for the selection of the plant automation system. |